PROJECT INVOLVEMENT
> OFFICE FITTING-OUT WORKS
Bank of America Merrill
Lynch Ø
New Office
fitting out work on 37/F to 39/F One IFC (Approximately 45,000ft2) (2011)
(LEED Gold certification) Ø
New Office fitting
out work on 18/F-22/F Kowloon Commerce Centre (2013) (Approximately
80,000ft2) (LEED Gold certification), including infrastructure upgrading
works with 2nos diesel engine 800kVA generator and 2nos total 700kW
air-cooled back-up chiller plant on roof. |
Wells Fargo Ø
Checking
Engineer and Commissioning Engineer for New Office fitting out work on 13/F
& 27/F, Three Pacific Place (2015) (Approximately 35,000ft2) Ø
New
Office fitting out work on 15/F, Tower 1, Kowloon Commerce Centre (2009)
(Approximately 18,000ft2) Ø
Server
room downsize at Cityplaza 4 (2013) Ø
Building
feasibility and Commissioning Engineer for Hong Kong new office space (2015) |
JPMorgan Chase Bank Ø
Office
consolidation work in JPMorgan Tower, Shatin (2010) Ø
Office
consolidation work on 11/F & 12 /F Grand Century Place, Mongkok. Ø
New
office fitting out at International Finance Centre, Beijing Ø
Office
fitting out work on 19/F (Approximately 20,000ft2) Chater House. Ø
Office
Consolidation work in Chater House. Ø
Office
fitting out work on 19/F & 20/F (Approximately 30,000ft2) Exchange Square Ø
Office
fitting out work at One Island East, L48 & L50 (Approximately 36,000ft2)
(2010) Ø
Office fitting
out work at One Island East, L47 [with new UPS Room] and back-up generator
plant on L36 (2011) Ø
Office
restacking work at JPMorgan Tower, Chater House (2011) |
Bloomberg Ø
Office
fitting out Work on 18/F Cheung Kong Centre (2010) (LEED Platinum certification)
(Approximately 18,00ft2) Ø
Office
fitting out Work on 25/F Cheung Kong Centre (2012) (LEED Platinum
certification) (Approximately 18,000ft2) Ø
Office
expansion fitting out Work on 23/F and 25/F Cheung Kong Centre (2012) (LEED
Platinum certification) Ø
Office
expansion fitting out Work on 19/F & 23/F Cheung Kong Center (2015)
(Approximately 8,000ft2) Ø
Office
expansion fitting out Work on 22/F Citibank Plaza (2015) (Approximately
28,000ft2) Ø
Studio
renovation Work on 26/F Cheung Kong Centre (2017) (Approximately 1,000ft2) |
BNP Paribas Hong Kong Ø
BNP
Paribas Front Office Relocation to 59/F to 63/F Ø
Two
International Finance Centre, Central, Hong Kong (Approximately 120,000ft2)
(2005) Ø
Fitting-out
work for the back office on 20/F to 22/F, PCCW Tower, Quarry Bay, Hong Kong Ø
(Approximately
45,000sqft (2003) Ø
Office
Renovation at Central Tower Ø
Fitting
out Work of the new office at 3 Exchange square 23/F-25/F, 27/F
(Approximately 48,000ft2) (2011) Ø
Office
restacking work at PCCW Tower, Two IFC, 3 Exchange Square (2011-2016) Ø
Fitting
out Work of the new office at 9/F Trade Square (Approximately 8,000ft2)
(2017) Ø
Hong
Kong office consolidation works 2021 at 2IFC, PCCW Tower & Lincoln House
(Approximately 40,000ft2) (2021) |
UBS Investment Bank (Project
Manager Service) Ø
Restacking
at Two International Finance Centre, Central, Hong Kong Ø
New
office fit out at One Exchange Square (2007) Ø
New
office fit out at Li Po Chun Building Sheung Wan |
UBS Investment Bank Ø
Restacking
at L52 Two International Finance Centre, Central, Hong Kong (2013) Ø
New
office fit out at 11/F Li Po Chun Chamber, Sheung Wan (Approximately
10,000ft2) (2010) Ø
M &
E verification for L50 & 51, 2 IFC (2011) Ø
New
office fit out at 44/F One Exchange Square (Approximately 15000ft2) (2013) Ø
New
office fit out at 43/F Two IFC (Approximately 20,000ft2) (2014) Ø
New
office fit out at 23/F & 25/F One Peking (Feb 2016) (LEED Gold
certification, approximately 18,000ft2) Ø
New
office fit out at 20/F One Peking, TST (Jan 2017) (LEED Gold certification,
approximately 9,000ft2) Ø
Multi-function
and Training room renovation at 52/F 2IFC (2020, approximately 500ft2) Ø
Existing
office fit out at 17/F Li Po Chun Chamber, Sheung Wan (Approximately
8,000ft2) (2021) Ø
Restacking
at L50/48/47 Two International Finance Centre, Li Po Chun Chamber &
Infinitus Plaza (2021) |
Fidelity Investment
Management (Hong Kong) Limited Ø
Fitting
out work of new office on 20/F to 22/F, Two Pacific Place, Queensway
(Approximately 4,500m2) (2011) |
Standard Chartered Bank
Branch Ø
New
branches at Causeway Bay, Great Centre, Hau Tak Centre, City Plaza and Sheung
Shui. Ø
Hong
Kong Trading Office at 12/F & 15/F 2IFC (Approximately 24,000ft2) (2009) Ø
Office
at 18/F & 19/F Standard Chartered Bank Building |
Citibank (Hong Kong)
Limited Ø
Fitting
out work for the office premises at Citibank Plaza in Central. Ø
Fitting
out work for the office at Wheelock House, Central Ø
Fitting
out work for the office at Citibank Plaza, Central Ø
Fitting
out work for the office at 55/F & 56/F One Island East (LEED Glod
certification) Ø
Fitting
out work / office restack for the office at 39/F, 40/F 47/F & 49/F of
Champion Tower, Central, including Ø
Main
Computer Room downsizing works at Harbour Front office and Citibank
Plaza(2016) Ø
Fitting
out work / office restack for the office at 48/F Trading floor at Champion
Tower, Central (2017) |
Baker & McKenzie Ø
Retrofit
of the office at Hutchison House (2008) Ø
Fitting
out work of the new office in Pacific Place One, Queensway (2008) |
The Executive Centre Ø
Fitting
out work for the office at One Island East, Quarry Bay Ø
Fitting
out work for the office at Wheelock House, Central Ø
Fitting
out work for the office at Nexxus Building, Central Ø
Fitting
out work for the office at Exchange Square, Central Ø
Fitting
out work for the office at 15/F & 16/F, Hong Kong Club Building (2016) Ø
Fitting
out work for the office at 5/F & 6/F, 28 Hennessy Road, Central (2016) Ø
Fitting
out work for the office at 20/F One IFC (2018) Ø
Fitting
out work for the office at 3/F & 5/F, The Factory, Wong Chuk Hung (2017) Ø
Fitting
out work for the office at 5/F & 19/F (12 floors), Chinachem Central Two
(2017) Ø
Fitting
out work for the office at 43/F & 44/F (40,000ft2), 3 Garden Road (2018) Ø
Fitting out
work for the office at 22/F, 23/F, 25/F & 26/F (16,000ft2), Prosperity
Tower (2019) Ø
Fitting
out work for the office at 35/F Two Pacific Place (20,000ft2, 2019) Ø
Fitting
out work for the office at 35/F & 36/F PCCW Tower (26,000ft2, 2020) Ø
Fitting
out work for the office at 15/F AIA Central (12,000ft2, 2021) |
Invesco Hong Kong Limited Ø
Fitting
out work of new office on 41/F and 42/F Citibank Tower of Citibank Plaza,
Garden Road, Central (2011) |
Blackrock Investment Ø
New
office fitting-out at York House Centre with new server room Ø
New
Disaster Recovery Site at Gateway |
Schroders Investment Ø
New
office fitout at Two Pacific Place with server room (2006) |
Westpac Banking Corporation
Ø
Fitting out
work of new office on 16/F York House Central (Approximately 8,000ft2) (2013) |
Fubon Bank Limited Ø
Bank
office and trading office fitting out work on 10/F to 13/F, Central Tower,
Central (Project Manager Service, 2006) |
Sears Buying Services Inc. Ø
Fitting-out
work for Sears Buying Services Inc., New offices at 18/F, CMG and Prudential
Tower, Gateway, Tsimshatsui. (Approximately 35,000ft2) (2001) Ø
MVAC
work at the AQC Lab, 18/F, CMG and Prudential Tower, Gateway, Tsimshatsui. |
Jardine Fleming Holdings
Ltd. Ø
Office
fitting-out work for 36/F, Jardine House. Ø
Retrofit
Work on 34/F and 35/F of Jardine House Ø
Office
fitting-out work for 19/F & 20/F, Grand Century Place. Ø
Office
fitting-out work for 45/F, Jardine House. Ø
Retail
shop fitting-out work at Grand Century Place. Ø
Investment
Centre on M/F Jardine House. |
JOS Technology Group Ø
Fitting
out work for the new office at 15/F to 21/F, Tower 1, Millennium City, Kwun
Tong, including one data centre. |
Swire Resources Limited, Solution
Interiors Design Consultant Limited Ø
Fitting
out work for Swire Resources Limited, New office on 21/F & 22/F, Somerset
House, Taikoo Place, Quarry Bay, Hong Kong |
Jardine Airport Services
Group Ø
Fitting out
work for the new office on 4/F, CNAC Tower, Dragonair & CNAC (Group)
Building, CLK Airport Ø
Fitting
out work for the office / operation centre at 4Z Airport. Ø
Fitting
out work for the Temporary Operation Control Centre |
Watson Wyatt Hong Kong
Limited Ø
Air
conditioning improvement work on 27/F & 29/F Sun Hung Kai Centre. |
Astec Custom Power (Hong
Kong) Limited Ø
Fitting
out work for the office and engineering centre at Lu Plaza, Kwun Tong |
CMG International Ø
Ftting
out work for CMG International Finance Regional Office on 55/F, Hopewell
Centre |
Office of the
Telecommunication Authority Ø
Fitting
out Work for the office for OFTA at 26/F, Wu Chung House. |
FCS Construction Co. Ø
Fitting
out work for Tomen Hong Kong Limited at 7/F Tower 3, Gateway, Harbour City Ø
Fitting
out work for MasterLink Securities (H.K.) Limited at 25/F, One International
Finance Centre, Central Ø
Fitting
out work for Asia On Line, 16/F One International Finance Centre. Ø
Fitting
out work for ORIX Asia Ltd, 14/F 1063 King's Road Ø
Fitting
out work for Westpex and Hong Kong Tenders Limited Ø
Dealing
Room, Computer Room and electrical improvement work for Indover Asia Limited
at 13/F Admiralty Centre, Tower II Ø
Fitting out
work for Amersham Pharmacia Biotech Asia Pacific Ltd at 13/F Tower One
Evergain Plaza. Ø
Fitting
out work for UL International Limited at Delta House, Shatin. |
3M Hong Kong Limited Ø
Office
Renovation Work on 5/F and 6/F, Victoria Centre, North point |
SAE Magnetic (HK) Ltd Ø
Office
fitting out work for the new office on 3/F, 5/F &6/F , Building 8, Hong
Kong Science and Technology Park, Tai Po |
Bovis Lend Lease Ø
Fitting
out work for the office of Telstra at Pacific Place Two, Queensway, Hong Kong |
Mok Design Ø
Fitting
out work for the office of Avaya at Shell Tower, Time Square, Causeway Bay,
Hong Kong |
Dow Corning Asia Ø
Office
relocation and fitting out work for new office at 27/F Sunning Plaza,
Causeway Bay Ø
Office
relocation and fitting out work at 14/F, AIA plaza, Causeway Bay |
Fortis Bank Ø
Fitting
out work for various floors of the office premises at Fortis Bank Tower,
Wanchai, Hong Kong Ø
Fitting
out work for the office at Central Plaza, Wanchai, Hong Kong |
Spencer Stuart Limited Ø
Fitting out
work of new office on 25/F Center Tower, Central (2012) |
Wrigley (HK) Ltd Ø
Fitting
out work of new office on 23/F Dorset House, HK (2012) |
McGraw Hill (HK) Ltd Ø
Fitting
out work of new office on 69/F International Commerce Centre (LEED Gold
Certification) (2012) Ø
Fitting
out work of new office on 68/F International Commerce Centre (approximately
7,000ft2, 2015) |
Yahoo (HK) Ltd Ø
Fitting
out work of new office on 15/F & 16/F Caroline Centre, HK (2013) |
Vodafone Hong Kong Ltd Ø
Fitting out
work of new office on 24/F Dorset House, HK (2015) |
Bank of China (Hong Kong) Ø
Fitting
out work of new office on 2/F BOC Center, Olympian City (Approximately
8,000ft2) (2015) |
Goodman Ø
Fitting
out work of new office on 9/F Three Pacific Place (Approximately 9,000ft2)
(2015) |
Manulife Financial Ø
Fitting
out work of office on 10/F & 16/F of Lee Garden (Approximately 30,000ft2)
(2016) Ø
Office
renovation works at 3/F, 5/F, 7/F to 12/F, 15/F of Manulife Tower (Approx.
18,000sqft each floor, 2021 & 2022) Ø
Office
renovation works at 11/F~13/F Tower A and 13/F Tower B of Manulife Financial
Centre (Approx. 20,000sqft each floor, 2022) |
The Wave, Co-working space Ø
Fitting
out work of office on 9/F, 10/F & 11/F of 4 Hing Yip Street, Kwun Tong (Approximately
6,000ft2) (2016) |
Wallem Ltd Ø
Fitting
out work of office on 8/F, 9/F & 18/F of Dorset House (Approximately
20,000ft2) (2016) |
Denuo & Digitas Ø
Fitting
out work of office on 18/F & 29/F of Paul Y Centre, Kwun Tong
(Approximately 23,000ft2) (2016) |
Israel Consulate General at
Admiralty Ø
Retrofit
of the Consulate Office (Approximately 5,000ft2) (2016) |
CVC Investment Ltd Ø
Fitting
out work of office on 20/F of ICBC Tower, 3rd Garden Road (Approximately
9,000ft2) (2016) |
CNN Ø
Fitting out
work of office and Studio on L23 & L25, 41 Heung Yip Road, Wong Chuk Hang
(Approximately 18,000ft2) (2017) |
Ricoh Ø
Existing
office restack and fitting out works at 15/F, 20/F & 21/F One Kowloon
(Approximately 30,000ft2) (2017) |
Jane Street Hong Kong Ø
Fitting
out work of office and trading office on 15/F Chater House, Hong Kong
(Approximately 9,000ft2) (2012) Ø
Office
and trading expansion and expansion on 15/F Chater House, Hong Kong
(Approximately 18,000ft2) (2017) Ø
Fitting out
work of office and trading office on 13/F Chater House, Hong Kong
(Approximately 18,000ft2) (2020) |
Swire - Blueprint 2.0 Ø
Co-working
space fitting out work on 2/F & 3/F of Dorset House, Taikoo Place
(Approximately 28,000ft2) (2017) |
American Express Ø
Existing
office restack and fitting out works at 17/F & 18/F Cityplaza 4
(Approximately 40,000ft2) (2017) |
TE Connectivity Ø
New
office fitting out works at 18/F Tower 1 of Kowloon Commerce Centre
(Approximately 18,000ft2) (2018) |
Hang Seng Bank Ø
Existing
office renovation and restack works at 18/F & 19/F Tower 1 of Grand
Central Place, Shatin (Approximately 28,000ft2) (2018) Ø
Business
Banking and office renovation at 2/F, 11/F & 12/F of Hang Seng TST
Commercial Building (Approximately 15,000ft2) (2019) |
Robert Half & Proviti Ø
New
office fitting out works at 9/F Nexxus Building (Approximately 6,000ft2)
(2018) |
CBA Hong Kong Ø
New
office fitting out works at 14/F One Exchange Square (Approximately
15,000ft2) (2019) |
China Construction Bank Ø
Existing
office fitting out works at 20/F China Construction Bank Tower (Approximately
6,000ft2) (2018) |
TP ICAP HK Ø
New
office fitting out works at 20/F & 21/F One Hennessy with dealing office
(Approximately 18,000ft2) (2019) |
Eversheds Sutherland Hong
Kong Ø
New office
fitting out works at 37/F One Taikoo Place (Approximately 22,000ft2) (2019) |
Prudential Ø
Office
restack and renovation at 5/F, One IFC (Approximately 8,5000ft2) (2019) |
Air Lease Hong Kong Ø
New
office fitting out works at 27/F Two IFC (Approximately 5,000ft2) (2019) |
Starbucks Coffee office at
Millennium City 5 Ø
New
office fitting out works at 12/F & 13/F Millennium City 5 (Approximately
28,000ft2) (2019) |
SunLife office at Cheung
Kei Center, Hung Hom Ø
New office
and training center fitting out works at 2/F, 3/F, 6/F-9/F & 16/F of
Tower A & G/F & 1/F of Tower B, Cheung Kei Center (Approximately
100,000ft2) (2019) |
CBRE Ltd Ø
New
office renovation works at 27/F One Pacific Place (Approximately 20,000ft2)
(2020) Ø
New
office renovation works at 19/F International Trade Tower (Approximately
9,500ft2) (2020) |
Aon at One Island East Ø
New
office renovation works at 33/F & 34/F One Island East, Taikoo Place
(Approximately 36,000ft2) (2020) |
WeLab office at K11
Atelier, North Point, Hong Kong Ø
New
office fitting out works at 22/F & 23/F, K11 Atelier, North Point
(Approximately 28,000ft2) (2020) |
Convoy Financial office at
Trust Tower, Wanchai Ø
New
office fitting out works at B/F to 20/F of Trust Tower (whole building)
(Approximately 25,000ft2) (2020) |
ALDI office at Millennium
City 6 Ø
New
office fitting out works at 9/F, 13/F & 18/F Millennium City 6, including
QA testing workshop (Approximately 35,000ft2) (2020) |
Warner Music office at
Manhattan Place Ø
New
office fitting out works at 39/F Manhattan Place, Kowloon Bay (Approximately
15,000ft2) (2020) |
Hong Kong Housing Society
office Ø
New
office fitting out works at 6/F, 8/F & 9/F of 1063 Kings Road, Quarry Bay
(Approximately 26,500ft2) (2021) Ø
New
office fitting out works at 28/F World Trade Centre, Causeway Bay (Approx.
11,000sqft,) (2021) Ø
New
office fitting out works at 15F of 1063 Kings Road, Quarry Bay (Approximately
9,000ft2) (2022) |
S&P Global Ø
New
office fitting out works at 3/F & 4/F Three Exchange Square, Central
(Approximately 24,000ft2) (2020) |
Development Bank of
Singapore (DBS) Hong Kong Ø
Main
power supply restacking for office at One Island East (2020) Ø
Essential
Chilled Water Pipe upgrade and replacement works for server room A/C at 10/F
The Centre (2020) Ø
Office
renovation works at 13/F & 16/F One Island East (Approx. 30,000sqft,)
(2021 & 2022) Ø
Office
renovation works at 12/F Mira Place (Approx. 3,000sqft) (2022) Ø
Server
room downsize project at 12/F One Island East (new UPS and CRAC system)
(2022) Ø
Office
renovation works at 16/F The Center (Approx. 16,000sqft) (2023) Ø
Office
renovation works at 13/F One Island East (Approx. 16,000sqft) (2023) |
PGIM office Ø
New
office fitting out works at 42/F Gloucester Tower, Central (Approximately
3,000ft2) (2022) |
Otto International Ø
New
office fitting out works at 19/F & 21/F of Peninsula Square, Hung Hom
(Approximately 23,000ft2) (2022) |
Macquarie Bank Ø
Existing
office UPS and Critical Equipment system relocation project at One IFC (2022) |
Boston Consulting Group Ø
New
office fitting out works at 37/F Two Taikoo Place (Approximately 21,000ft2)
(2023) |
BASF Hong Kong Ø
New
office fitting out works at 35/F & 36/F Two Taikoo Place (Approximately
32,000ft2) (2023) |
FWD Insurance Ø
New
office fitting out works at 16/F Devon House (Approximately 12,000ft2) (2023) |
PROJECT INVOLVEMENT
> OFFICE FITTING-OUT WORKS